Sunday, April 3, 2022

Final: Mast project images for 145.550 Mhz ZS-Link Radio Antenna (Part 2)

Well all the hard work came together this past week and a final installation was done on the 2 April 2022 at the QTH of  ZS1I.  The 12 meter aluminum mast was lifted after fitting a Diamond X50  VHF/UHF Antenna to it. The antenna will be used for the ZS1I GRHub Network 145.550 Mhz Simplex Link on AllStar and will also be linked to the ZS-Link Network.  The lift went well and the mast was secured with 3 x temporary stay nylon ropes.  Here are a few images of the aluminum flag pole mast and antenna installed.  (Click on images for large view.)



 







Reception and Transmission reports are most welcome and can be given on the GRHub Network by connecting to Echolink ZS1I-L +  AllStar 49355 or via email by clicking HERE.

Bloemfontein ZS4RM AllStarLink Node now active!

  Yet again another AllStar Node has been activated. This time it is the node of  Roelhof ZS4RM from Bloemfontein. Bloemfontein is located i...